JaCoW Logo

Reference Search

Author: A. Ganshyn


References



Reference
H. Ao et al., “Installation Progress on FRIB =0.041 Cryomodules Toward Beam Commissioning”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 1087-1089.
J. Wei et al., “FRIB Project Status and Beam Instrumentation Challenges”, in Proc. 6th Int. Beam Instrumentation Conf. (IBIC'17), Grand Rapids, MI, USA, Aug. 2017, pp. 1-7.
J. Wei et al., “The FRIB Superconducting Linac - Status and Plans”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. XX-XX.
D. Luo et al., “Solenoid/Magnetic Shielding Test Results in FRIB-1&2 Cryomodules”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 607-609.
T. Xu et al., “FRIB Cryomodule Design and Production”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 673-678.
T. Xu et al., “SRF Devlopment and Cryomodule Production for the FRIB Linac”, in Proc. North American Particle Accelerator Conf. (NAPAC'16), Chicago, IL, USA, Oct. 2016, pp. 847-852.
H. Ao et al., “Fabrication and Cold Test Result of FRIB =0.53 Pre-production Cryomodule”, in Proc. 18th Int. Conf. RF Superconductivity (SRF'17), Lanzhou, China, Jul. 2017, pp. 120-124.
J. T. Popielarski et al., “Performance Testing of FRIB Early Series Cryomodules”, in Proc. 18th Int. Conf. RF Superconductivity (SRF'17), Lanzhou, China, Jul. 2017, pp. 715-721.
T. Xu et al., “Progress of FRIB SRF Production”, in Proc. 18th Int. Conf. RF Superconductivity (SRF'17), Lanzhou, China, Jul. 2017, pp. 345-352.
H. Ao et al., “FRIB Driver Linac Integration to be ready for Phased Beam Commissioning”, presented at the North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, paper WEPLH09.
17 results


Back to the list